WP7: Advanced hybrid pixel detectors

Objectives

  • Define technological guidelines for the production of advanced silicon pixel sensors for HEP tracking and timing applications.
  • Improve access to a pool of specialised foundries  for the production of planar and 3D sensors
  • Optimize the technology of Low Gain Avalanche Detectors (LGAD), for tracking and timing applications
  • Validation of the produced sensors

Tasks

Task Task leaders

Task 7.1 Scientific coordination

Anna Macchiolo (MPG-MPP)
Ivan Vila (CSIC)

Task 7.2 TCAD simulations

Gian Franco Dalla Betta (INFN Trento) 
Daniele Passeri (University of Perugia)

Task 7.3 Common process optimisation for hybrid pixel sensors

Maurizio Boscardin (FBK)
Giulio Pellegrini (CSIC-CNM)

Task 7.4 Detector validation for tracking devices

Marco Meschini (INFN Firenze)
Dominik Dannheim (CERN)
Task 7.5 Detector validation for LGAD sensors Nicolo Cartiglia (INFN Torino)
Marcos Fernandez (Santander)
WP7 Technology Transfer Officer Cinzia Da Via (UNIMAN)

Deliverables

Del. no. Deliverable name WP no. Planned delivery date Actual delivery date Status  Comments
D7.1 Simulation of 3D pixel sensor cells 7 M18 04/11/2016 Achieved Report
D7.2 Simulation active edge sensors 7 M18 04/11/2016 Achieved Report
D7.3 LGAD simulation 7 M18 04/11/2016 Achieved Report
D7.6 Initial pixel characterisation 7 M24 28/04/2017 Achieved Report
D7.5 Wafer Layout MPW run 7 M30 14/12/2017 Achieved Report
D7.4 TCAD model radiation damage 7 M52 31/12/2019 Achieved Report
D7.7 Final pixel characterisation 7 M52 31/12/2019 Achieved Report
D7.8 LGAD characterisation 7 M52 25/03/2020 Achieved Report

Milestones

Mil. no. Milestone name WP no. Planned delivery date Actual delivery date Status Comments
MS29 Validation and release of TCAD simulation 7 M16 02/09/2016 Achieved Report
MS49 Workshop on 3D-planar 7 M24 27/04/2017 Achieved Report
MS50 LGAD thickness technological choice 7 M24 28/04/2017 Achieved Report
MS51 LGAD Workshop on the characterisation results of the available LGAD sensors 7 M24 27/04/2017 Achieved Report
MS81 Test beam campaign for 3D and planar sensors 7 M36 30/04/2018 Achieved Report
MS87 MPW runs completion 7 M42 13/03/2019 Achieved Report
MS98 Validation radiation damage model with data comparison 7 M46 19/12/2019 Achieved

Report

Justification for delay

Publications

The list of WP7 publications can be found in CDS. 