Objectives
- Improve the integration of ultra-light support structures and cooling devices in the design of future detectors
- Develop the missing building blocks for a generalized implementation of micro-channel cooling devices
- Provide common standards for the fabrication and testing of micro-channel cooling devices
- Develop a facility for low-mass support structure testing, with adequate standards for characterization and validation
- Provide and validate test structures and libraries for FEA simulations
Tasks
Task | Task leaders | |
---|---|---|
Task 9.1 Scientific coordination | Paolo Petagna (CERN) Georg Viehhauser (UOXF) |
|
Task 9.2 Micro-channel cooling building blocks | Giovanni Calderini (CNRS-LPNHE) | |
Subtask 9.2a | Prototypes | Marco Bomben (CNRS-LPNHE) Filippo Bosi (INFN Pisa) |
Subtask 9.2b | Connectors | Alessandro Mapelli (CERN) Marcel Vos (CSIC-IFIC) |
Subtask 9.2c | Simulations | Yvonne Moussy (CERN) Davide Delcol (UniPadova) |
Subtask 9.2d | Test facilities and test execution | Paolo Petagna (CERN) Andrea Cioncolini (UNIMAN) |
Task 9.3 Low mass mechanical structures | Georg Viehhauser (UOXF) | |
WP9 Technology Transfer Officer | Alessandro Mapelli (CERN) |
Deliverables
Del. no. | Deliverable name | WP no. | Planned delivery date | Actual delivery date | Status | Comments |
---|---|---|---|---|---|---|
D9.5 | Advanced Mechanical facility requirements | 9 | M14 | 05/08/2016 | Achieved | Report |
D9.6 | Common test structures | 9 | M24 | 19/05/2017 | Achieved | Report |
D9.1 | Station for tests on μ- channel test devices | 9 | M30 | 03/11/2017 | Achieved | Report |
D9.2 | μ-channel prototypes | 9 | M30 | 30/11/2017 | Achieved | Report |
D9.3 | Technology recommendations for μ-channel cooling | 9 | M46 | 09/03/2020 | Achieved | Report |
D9.4 | Qualification and characterisation of μ- channel cooling | 9 | M46 | 09/03/2020 | Achieved | Report |
D9.7 | Standard procedures for qualification and characterisation | 9 | M58 | 14/04/2020 | Achieved | Report |
Milestones
Mil. no. | Milestone name | WP no. | Planned delivery date | Actual delivery date | Status | Comments |
---|---|---|---|---|---|---|
MS8 | Advanced Mechanical Distributed facility requirements | 9 | M9 | 16/06/2016 | Achieved | Report |
MS24 | CFD models available | 9 | M14 | 25/08/2016 | Achieved | Report |
MS77 | Standard connectors available | 9 | M35 | 18/04/2018 | Achieved | Report |
MS82 | Validated CFD models ready | 9 | M36 | 19/06/2018 | Achieved | Report |
MS99 | Advanced Mechanical Distributed facility ready | 9 | M46 | 28/02/2019 | Achieved | Report |
Publications
The list of WP9 publications can be found in CDS.