Year 1 | Year 2 | Year 3 | Year 4 | Year 5
Year 1
There are no deliverables due in Year 1.
Year 2
Del. | Deliverable name | WP | Planned delivery date | Actual delivery date | Status | Comments |
D2.1 | Key technological areas | WP2 | M14 | 31/10/2016 | Achieved | Report |
D9.5 | Advanced Mechanical facility requirements | WP9 | M14 | 05/08/2016 | Achieved | Report |
D5.1 | Interface definition | WP5 | M15 | 05/09/2016 | Achieved | Report |
D7.1 | Simulation of 3D pixel sensor cells | WP7 | M18 | 04/11/2016 | Achieved | Report |
D7.2 | Simulation active edge sensors | WP7 | M18 | 04/11/2016 | Achieved | Report |
D7.3 | LGAD simulation | WP7 | M18 | 04/11/2016 | Achieved | Report |
D15.9 | JSI TRIGA Reactor Transport system | WP15 | M18 | 04/11/2016 | Achieved | Report |
D2.2 | PoC selection | WP2 | M23 | 17/03/2017 | Achieved | Report |
D7.6 | Initial pixel characterisation | WP7 | M24 | 28/04/2017 | Achieved | Report |
D9.6 | Common test structures | WP9 | M24 | 19/05/2017 | Achieved | Report |
D13.6 | Miniaturised HV power supply | WP13 | M24 | 28/04/2017 | Achieved | Report |
D13.7 | Resistive anode manufacturing | WP13 | M24 | 24/07/2017 | Achieved | Report |
D15.1 | CERN pixel beam telescope for the PS | WP15 | M24 | 27/03/2017 | Achieved | Report |
D15.6 | CERN proton facility upgrade | WP15 | M24 | 11/05/2017 | Achieved | Report |
D15.10 | GIF++ gas system | WP15 | M24 | 31/05/2017 | Achieved | Report |
Year 3
Del. | Deliverable name | WP | Planned delivery date | Actual delivery date | Status | Comments |
D5.2 | Trigger Logic Unit ready | WP5 | M30 | 15/12/2017 | Achieved | Report |
D5.3 | Data acquisition software | WP5 | M30 | 06/12/2017 | Achieved | Report |
D5.4 | Data acquisition hardware | WP5 | M30 | 22/12/2017 | Achieved | Report |
D5.5 | Online event data model | WP5 | M30 | 30/11/2017 | Achieved | Report |
D7.5 | Wafer Layout MPW run | WP7 | M30 | 14/12/2017 | Achieved | Report |
D9.1 | Station for tests on μ- channel test devices | WP9 | M30 | 03/11/2017 | Achieved | Report |
D9.2 | μ-channel prototypes | WP9 | M30 | 30/11/2017 | Achieved | Report |
D15.3 | Environmental control system at DESY | WP15 | M30 | 27/10/2017 | Achieved | Report |
D15.4 | New Frascati beam line | WP15 | M30 | 07/06/2019 | Achieved | |
D3.1 | Implementation of extensions in USolids | WP3 | M32 | 20/12/2017 | Achieved | Report |
D3.2 | Implementation of DD4hep extensions | WP3 | M34 | 27/02/2018 | Achieved | Report |
D3.6 | Geant4 based simulation toolkit DDG4 | WP3 | M35 | 12/03/2018 | Achieved | Report |
D3.3 | Alignment Toolkit | WP3 | M36 | 27/04/2018 | Achieved | Report |
D4.1 | CMOS 65 nm engineering run | WP4 | M36 | 09/04/2018 | Achieved | Report |
D4.2 | BICMOS SiGe engineering run | WP4 | M36 | 09/04/2018 | Achieved | Report |
D13.1 | Validation of new resistive materials for RPCs | WP13 | M36 | 24/05/2018 | Achieved | Report |
D13.3 | Optimisation of large-size precise space-resolution RPC structures | WP13 | M36 | 18/06/2018 | Achieved | Report |
D13.9 | Production protocols of optimised RPC components | WP13 | M36 | 23/06/2018 | Achieved | Report |
D14.3 | Advanced Assembly chain for Si calorimeters | WP14 | M36 | 18/05/2018 | Achieved | Report |
D14.5 | Common running of calorimeter prototypes | WP14 | M36 | 18/05/2018 | Achieved | Report |
D14.8 | Large leak-less system, thermal model | WP14 | M36 | 18/06/2018 | Achieved | Report |
D15.2 | Silicon strip reference tracker at DESY | WP15 | M36 | 29/03/2019 | Achieved | |
D15.8 | Cold irradiations at Birmingham | WP15 | M36 | 10/04/2018 | Achieved | Report |
Year 4
Del. | Deliverable name | WP | Planned delivery date | Actual delivery date | Status | Comments |
D3.8 | Advanced Particle Flow algorithms | WP3 | M38 | 25/06/2018 | Achieved | Report |
D3.7 | Advanced Tracking tools | WP3 | M39 | 20/01/2020 | Achieved | |
D3.4 | Event Data Model toolkit | WP3 | M40 | 24/09/2018 | Achieved | Report |
D6.1 | TCAD libraries | WP6 | M40 | 30/09/2018 | Achieved | Report |
D6.6 | Assemblies delivered | WP6 | M40 | 31/08/2018 | Achieved | Report |
D8.4 | Very high Voltage | WP8 | M40 | 31/08/2018 | Achieved | Report |
D14.2 | Performance of test infrastructure for highly granular optical readout | WP14 | M40 | 20/08/2018 | Achieved | Report |
D6.5 | Optimised interconnection process | WP6 | M42 | 13/05/2019 | Achieved | |
D14.7 | Electron beam welding demonstrator | WP14 | M42 | 07/12/2018 | Achieved | Report |
D2.3 | Identification of companies (production capabilities including evaluation of possible samples and prototypes) | WP2 | M44 | 18/01/2019 | Achieved | Report |
D8.1 | Purification and monitoring | WP8 | M44 | 21/12/2018 | Achieved | Report |
D13.2 | High-rate characterisation of large-size RPC prototypes | WP13 | M44 | 18/01/2019 | Achieved | Report |
D13.4 | Large-size prototype of R-WGEM | WP13 | M44 | 22/01/2019 | Achieved | Report |
D13.5 | Prototype of a largesize high-gain MPGD | WP13 | M44 | 21/12/2018 | Achieved | Report |
D13.8 | MPGD gain map hole-by-hole | WP13 | M44 | 18/02/2019 | Achieved | Report |
D14.6 | Updated readout system | WP14 | M44 | 24/01/2019 | Achieved | Report |
D15.7 | Radiation-hard facility instrumentation for the CERN proton facility | WP15 | M44 | 25/02/2019 | Achieved | Report |
D6.2 | Sensor-design guidelines | WP6 | M46 | 02/04/2019 | Achieved | Report |
D6.7 | Recommendation for industrialisation | WP6 | M46 | 22/03/2019 | Achieved | Report |
D8.3 | Light readout | WP8 | M46 | 29/03/2019 | Achieved | Report |
D8.5 | Magnetisation of large-scale cryogenic liquid detectors | WP8 | M46 | 08/03/2019 | Achieved | Report |
D9.3 | Technology recommendations for μ-channel cooling | WP9 | M46 | 09/03/2020 | Achieved | Report |
D9.4 | Qualification and characterisation of μ- channel cooling | WP9 | M46 | 09/03/2020 | Achieved | Report |
D14.1 | Fibre test benches | WP14 | M47 | 06/03/2019 | Achieved | Report |
D15.11 | GIF++ Facility upgrade | WP15 | M48 | 30/04/2020 | Achieved |
Year 5
Del. | Deliverable name | WP | Planned delivery date | Actual delivery date | Status | Comments |
D15.5 | Frascati photon tagging system | WP15 | M52 | 30/04/2020 | Achieved | Report |
D7.4 | TCAD model radiation damage | WP7 | M52 | 31/12/2019 | Achieved | Report |
D7.7 | Final pixel characterisation | WP7 | M52 | 31/12/2019 | Achieved | Report |
D7.8 | LGAD characterisation | WP7 | M52 | 25/03/2020 | Achieved | Report |
D4.3 | Through Silicon Vias production | WP4 | M54 | 19/12/2019 | Achieved | Report |
D8.2 | Charge readout and double phase | WP8 | M54 | 19/12/2019 | Achieved | Report |
D3.5 | Parallel versions of event processing frameworks | WP3 | M56 | 15/01/2020 | Achieved | Report |
D5.6 | Common DAQ system used in combined beam tests | WP5 | M57 | 31/01/2020 | Achieved | Report |
D14.4 | Very compact calorimeters | WP14 | M57 | 31/01/2020 | Achieved | Report |
D6.4 | Radiation tolerance assessment | WP6 | M58 | 25/03/2020 | Achieved | Report |
D6.3 | Performance characterisation results | WP6 | M58 | 20/04/2020 | Achieved | Report |
D9.7 | Standard procedures for qualification and characterisation | WP9 | M58 | 14/04/2020 | Achieved | Report |
D6.8 | Final report on HV/ HR CMOS devices | WP6 | M58 | 20/04/2020 | Achieved | Report |
D2.4 | PoC projects assessment (final review and perspective of PoC supported projects) | WP2 | M60 | 30/04/2020 | Achieved | Report |
D2.5 | Use of AIDA-2020 results | WP2 | M60 | 30/04/2020 | Achieved | |
D10.1 | Transnational Access to CERN & DESY testbeams | WP10 | M60 | 30/04/2020 | Achieved | Report |
D11.1 | Transnational Access to irradiation test facilities: CERN IRRAD, CERN GIF++, JSI, KIT, UCLouvain, UoB | WP11 | M60 | 30/04/2020 | Achieved | Report |
D12.1 | Transnational Access to detector characterisation facilities: RBI & ITAINNOVA | WP12 | M60 | 30/04/2020 | Achieved | Report |